Henry Street (Stage 1), Glynde
Henry Street Stage 1 was acquired in May 2023 with settlement occurring in August 2023.
Development Approval was granted prior to settlement for 3 x 2-storey, Torrens Titled townhomes which will be completed to a high standard.
Construction is due to commence in mid 2024 with a 12 month construction timeframe, allowing these homes to hit the market in mid 2025.
Each dwelling will comprise 4 bedrooms, 3 bathrooms and 2 living areas. Designed with flexibility in mind, the ground floor will offer a master guest suite with walk in robe and ensuite, large luxurious kitchen with walk in pantry, laundry, open plan living/dining and undercover alfresco. The upper floor will offer a second master suite, again with walk in robe and ensuite bathroom, with a further 2 bedrooms, each with walk in robe, third bathroom, rumpus/living and study.
Each street facing dwellings will feature a modern, curved upper level façade, with the boundary side dwellings each offering a double garage.
High quality finishes will complement the flexible floor plan with an external interior design company utilised to ensure these dwellings will last the test of time.